ABB 1MRK002239-BBR01 Binary Input Module | ABB Relion Protection & Control

Brand: ABB

Model: 1MRK002239-BBR01

Type: Binary Input Module

Series: Relion Series

Core Function: Digital Signal Input & Protection System Interface

Country Of Origin: Sweden

Condition: New Original

Availability: Ready Stock

Warranty: 12 Months

Category: Brand:
  • Need Help?
  • +86 13313703791
  • +86 13313703791
  • seren@ymgkplc.com
库存图标
100,000+ Models in Stock
保修图标
One-Year Warranty
响应图标
24h Fast Response

Description

PRODUCT OVERVIEW

ABB 1MRK002239-BBR01 is an original plug-in switching power supply board exclusively matched with ABB Relion 650 and 670 series protection & control intelligent electronic devices (IED). It converts substation AC/DC auxiliary power into multiple groups of isolated stabilized DC power for the relay’s main CPU, sampling circuit, communication chip and digital I/O loop. Adopting passive heat dissipation design with built-in lightning surge, overvoltage, overcurrent and short-circuit protection circuits, it features low output ripple, high isolation strength and strong anti-electromagnetic interference capability, adapting to harsh working conditions of high voltage substations and power plants. Widely used for failure replacement and emergency spare backup of feeder protection, transformer protection, generator protection and busbar protection relays in power grid transmission & distribution systems.

TECHNICAL SPECIFICATIONS

Item Parameter Details
Part Number 1MRK002239-BBR01
Product Type Built-in power supply PCB board for protection relay
Input Range Universal wide input: 85~264V AC / 100~250V DC
Output Mode Multi-channel isolated regulated DC output (+5V, ±12V, 24V etc.)
Isolation Strength ≥2500V AC isolation between input, output and chassis ground
Working Temperature -25℃ ~ +70℃ continuous full-load operation
Storage & Transport Temp -40℃ ~ +85℃
Cooling Mode Natural convection passive heat dissipation, fan-free design
Protection Mechanism Surge suppression, OVP, OCP, short-circuit automatic lock protection
Backplane Interface Standard golden finger backplane plug-in installation
Compliance Standard IEC 60255, IEC 61000 EMC, CE safety certification
Origin Sweden
Product Attribute Original factory power spare part for ABB Relion series protection equipment

 

COMMERCIAL PROCUREMENT PROTOCOL

  1. System Compatibility Audit: Professional power automation engineers verify the corresponding protection device model, rack slot specification and hardware version to realize zero-modification seamless replacement.
  2. Graded volume discount mechanism: Optimized unit price matching different purchase quantities, synchronously update real-time inventory data and international logistics expense information.
  3. Full-set export document service: Provide standardized complete export materials and unified HS declaration plan to improve customs clearance efficiency for global power industry customers.
  4. Issuance of stamped official commercial PI: Cooperate with internal financial approval and capital payment workflow of power enterprises through formal stamped proforma invoice.
  5. Standard cross-border settlement mode: Support mainstream international payment represented by T/T telegraphic transfer.
  6. Comprehensive pre-delivery performance verification: Each power board undergoes continuous load aging test, each channel output precision calibration, ripple noise detection and protection function triggering test before warehouse delivery.
  7. Standard anti-damage export packaging scheme: Vacuum ESD sealed bag + customized high-density shockproof foam + pressure-resistant thickened export carton, effectively preventing power device desoldering and PCB damage caused by collision and extrusion during cross-border long-distance transportation.
  8. Authorized global logistics distribution: Cooperate with official operation channels of DHL, FedEx and UPS, and feed back real-time tracking number immediately after goods are delivered to logistics providers.

 

VISUAL PRODUCT SHOWCASE

  1. Product Photo 1: Overall structural diagram of 1MRK002239-BBR01 power board, marking high-frequency transformer, capacitor bank and golden finger interface

1MRK002239-BBR01 的图像结果

  1. Product Photo 2: Layout of internal power conversion circuit and safety protection components

1MRK002239-BBR01 的图像结果

 

MATCHING SPARES & ACCESSORIES

Relion series protection relay main board, communication module, signal acquisition board, relay backplane frame, original maintenance manual, official wiring definition file

AFTER-SALES GUARANTEES

12-month warranty against inherent hardware defects under rated working conditions. All supplied boards are original genuine goods (brand new original spare parts or dismantled used boards after full performance testing), completely consistent with factory electrical indexes and installation dimensions. We will send official datasheets and field replacement operation specifications by email. Free remote technical support covers power board replacement guidance, relay power-on debugging and common power failure troubleshooting.

FAQ

What core role does 1MRK002239-BBR01 undertake in substation protection relays?It is the core power source of the whole protection IED. Stable multi-channel power supply ensures reliable operation of fault sampling, logic judgment and trip output functions of the protection relay, avoiding protection refusal or misoperation caused by power supply abnormality.Will replacing this power board clear the original relay setting parameters?Protection fixed values and configuration data are stored in the relay mainboard flash memory; power board replacement will not erase any program parameters, only power-on reset detection is needed after installation.Are second-hand disassembled power boards fully inspected before delivery?All recycled used boards go through circuit cleaning, capacitor aging screening, full-range output calibration and long-time power aging test strictly on professional test benches to restore factory performance indicators before delivery.Delivery cycle for spot goods?Goods are stored in domestic warehouse, all delivery formalities will be finished within 3 working days after payment confirmation.

Contact info